Tellurian seeks more time to complete Driftwood LNG terminal

The Driftwood project faced the single biggest booster LNG has ever seen and we have seen our fair share of LNG-boosting crazes. Who does still remember the China bubble, the Fukushima kick, or the North American El Dorado factor (yes I know that’s quite some years in the past)? All those, as massive as they may have been paled in comparison to the Ukraine war booster. Sure, there is a perceived problem with conventional energy projects which makes financing them harder but the Ukraine boost is still one of a kind. And Tellurian did not pull its project off despite this massive boost. Something is fundamentally wrong with Driftwood. 

Linkedin Thread